How To Speed Up RAMS Document Review Without Cutting Corners
Most of a RAMS review is spent finding the problems rather than judging them. Separate those two jobs and the same document takes half the time.
Expert guidance on RAMS documents, CDM compliance and construction health and safety. 38 articles, and a help centre for questions about Valify itself.
A RAMS is not a form to fill in from top to bottom. Work through it in the order the logic runs and the document assembles itself — and stops contradicting itself.
Showing 12 of 38 articles
Most of a RAMS review is spent finding the problems rather than judging them. Separate those two jobs and the same document takes half the time.
An inspector does not read your RAMS from the front. They check five things, and what they are really testing is whether the document matches the site.
A RAMS is not a form to fill in from top to bottom. Work through it in the order the logic runs and the document assembles itself — and stops contradicting itself.
At fifty documents a week the enemy is not difficulty, it is sameness. Consistency has to come from the process, because it will not come from concentration.
The immediate cost of a weak RAMS is a rejection and a lost day. The real cost arrives later, when the document is read back to you by somebody investigating an injury.
A document gap costs nothing at all, right up until the moment it costs everything. Three scenarios built from the patterns that recur.
A template should carry the structure and none of the answers. Most downloadable templates do the opposite, which is why they keep producing documents that get returned.
The case for automated document review is not that machines are cleverer than reviewers. It is that they are identically thorough on the ninth document of the day.
A checklist to work through on any RAMS submitted for a UK construction project. It ends with the cross-document checks — the ones that catch what reading section by section cannot.
A prohibition notice on work at height rarely follows an exotic failure. It follows one of eight gaps, and all eight are visible in the document.
A straightforward RAMS takes an experienced reviewer 45 minutes to an hour and a half. The honest problem is not competence — it is what happens to the tenth document of the day.
Every section of a RAMS changes when the work is excavation. This is what each one has to contain, in the order you should write them.
3 free scans. No card required. No commitment.
Get Started — Redeem Your 3 Free Scans